Case Study

Efficiency in Building Layout and Design 

Building Layout / Operational Flow

Our client’s CDI was designing a new facility to move their operations to. Current operations we at capacity in their main facility with three additional off-site locations being utilized as well. Carrus Group received their initial new plant design and began running production flow models through the building which revealed the inefficiencies in the operational flow as well as the budget overruns caused by the building layout.

Building Redesign – Cost Savings

Our Industrial Engineers and Project Managers went to work, studying our clients process and letting that drive the new building design. We were able to create a building that more efficiently supports their operations while allowing for greater future expansion on the site. Carrus Group also looked specifically at the material handling assumptions that were made in the design and better aligned them with equipment and process resulting in a $2.2 million dollar savings for that budget. Total cost savings are nearing $4.5 million, without taking into considerations for increases in throughput and efficiencies. $1.2 M – Pre-cast / Steel $2.2 M – Overhead Cranes $450K – Concrete Site Work 123K sq ft – Future Expansion Customer Contact Patrick McDermott – Director of Manufacturing / Operations

Key Points & Methods

Key Points • Let the Process Lead the Design • Optimize Production Layout • Proper testing of new process • Attack over-engineering. • Efficiency in Flow of Plant • Future Proof Site • Lower Construction Costs Our Method • Evaluate ALL Operations and Processes Flow • Assess Building Design • Engage client and Test recommended changes. • Document Changes and Implement New Design • Equipment Selection / Install

“

Lorem ipsum dolor sit amet, consequat del amini van nostrund por et al numen lumen vaminol somos puis vallerial. Etiam porttitor lacus au semper commodo.”

Richard Jameson Company Name

More Case Studies

Maximized Space, Minimized Investment

How Carrus Group saved Piranha $2M: With a future-forward mentality and significant growth plan, Piranha contacted Carrus Group to help them transition into a larger building to streamline their production, modernize their facility, and allow for acquisition of future businesses.

Strategic Consolidation for Optimal Results

At Carrus Group, we partner with our clients to improve the layout of production facilities, optimize production flow, eliminate waste, increase production quality and project manage special projects

Lorem ipsum dolor sit amet, consectetuer adipiscing, sed diam nonummy nibh euismod tincidunt ut laoreet dolore magna aliquam erat volutpat. Ut wisi enim ad minim veniam, quis nostrud exerci tation ullamcorper suscipit lobortis nisl ut aliquip ex ea commodo.